Here we have our towel (that'll be used to contain the soccer ball) and the PVC pipe for the weights. Once again we've shortened the pipe because it would've left a gap between the cap and the weights (which could prevent the swinging arm from a strong launch). Between now and the next building day we need to figure out the launch mechanism and something to use to tighten up the upper PVC pipe.

No comments:
Post a Comment