Thursday, April 10, 2014

3/26/14 Trebuchet- Gunawork, Nathan, Jackson


On this building day, we shortened the PVC pipe that'll be holding the weights.  We estimated and decided to cut a portion off, because we didn't want an open space between the weights and the end caps. Tomorrow we'll start building a track that's going to be at the base of the frame when the swinging arm slides the ball through the loop of the sling shot.   

No comments:

Post a Comment