On this building day, we shortened the PVC pipe that'll be holding the weights. We estimated and decided to cut a portion off, because we didn't want an open space between the weights and the end caps. Tomorrow we'll start building a track that's going to be at the base of the frame when the swinging arm slides the ball through the loop of the sling shot.

No comments:
Post a Comment